FieldCO

FieldCO / Field change directives

Get the extra work signed before you build it.

Not another all-in-one jobsite platform. FieldCO turns a “just do it” from the GC into a signed, priced change directive — on site or by text.

Try all Pro features free for 14 days. No payment details required. Nothing is charged unless you choose a paid plan and complete checkout.

No demo call. No sales rep. Grab our free printable template or trade template packs.

How to write a change order in construction

[ 01 ]

Capture in the field

Pick the job, snap photos of the condition, describe the scope, and enter a lump-sum price.

[ 02 ]

Sign on the spot

Hand your phone to the GC superintendent. They review the scope and amount and sign right on screen.

[ 03 ]

Remote approval

Share a private link. The super reviews photos, description, and price on their own phone and signs digitally.

[ 04 ]

Track every directive

See every directive by job, status, date, and dollar amount. Know what is signed and what needs attention.

[ 05 ]

Pay-app ready

Export a clean signed packet with timestamps, photos, totals, and signatures for your monthly pay application.

Every plan

Unlimited directives.
Fixed monthly cost.

From $19.99/month

From field condition to priced scope

Illustrative example · not a customer record
Illustrative electrical installation with conduit and receptacles on an unfinished wall

SAMPLE CD-0001 / ELECTRICAL

Two additional wall receptacles

Provide conduit, wiring, and two receptacles outside the original scope. Review the condition photo and lump-sum price before signing.

LUMP-SUM TOTAL

$1,850.00

Awaiting signature

See how it works

Demo · fictional data · nothing here saves, sends or signs
  1. Step 1

    Select a job and add a photo

  2. Step 2

    Enter scope, price and schedule impact

  3. Step 3

    Review and request approval

  4. Step 4

    The GC rep signs or requests changes

Step 5 · The completed packet (actual export layout, sample data)

Example Electric Co. (fictional)
Field Change Directive

CD-0001 v1

Lump sum
$1,850.00
Job
Riverside Medical — Tenant Fit-Out (sample)
General contractor
Example Builders GC
Created
Sep 14, 2026, 5:58 PM
Status
Approved
Foreman
Sam Rivera
Schedule impact
0 days
Project address
100 Sample Way, Anytown
Sent for approval
Sep 14, 2026, 6:05 PM

Scope

Two additional wall receptacles

GC requested two added receptacles on the east wall of Room 214 after rough-in. Provide conduit, wiring, boxes, and devices outside the original scope. Includes patching and plate covers.

Photos (1)

Condition photo 1

Authorized by

Signature

Dana Whitfield (sample), Superintendent, Example Builders GC

Sep 14, 2026, 10:42 PM UTC · Approval method: signed on their own device via private link

By signing, the representative confirms the scope and lump-sum price above were reviewed and authorizes the subcontractor to proceed with the work. This records approval of the extra work and its price; it does not amend the main contract or guarantee payment terms.
Open the full sample packet

Built for every trade in the field

Keep extra work documented, priced, and signed — without adding another complicated system to your day.

ElectricalHVACPlumbingDrywallConcrete

Field notes for subcontractors